Reduce the no_predictions Senate quality gate backlog by adding falsifiable, testable predictions to hypotheses that lack them. Each prediction should be tied to a measurable expected observation so the hypothesis can be evaluated by downstream governance and market mechanisms.
no_predictions backlog are inspectedno_predictions counts are recordedpredictions_count = 0 or no linked hypothesis_predictions rows.6da303b5-62fc-4c88-9aff-9345784b5e8a - Failed quality gate triagede85e156-b7e3-4513-a586-4f3762a824f7 - Hypothesis predictions tableno_predictions had 44 fail rows in quality_gate_results; latest system-check payload reported 122 current affected hypotheses.